TXDOT Bridge Replacement on Precinct Line Road at Walker Branch Creek, Tarrant County

This project is located within the City of Hurst on Precinct Line Road between Harvard Avenue and I-10, as well as ½ mile on Trinity Boulevard. The work consists of bridge demolition, new bridge construction, and roadway improvements. The new five-span, 300’ long, 90’ wide pre-cast concrete girder bridge is being constructed in two phases. It features 61 pre-cast concrete beams and a 27,000 SF cast-in-place deck elevated over Walker Branch Creek. Additional work on this project includes roadway excavation, roadway embankment, channel excavation, subgrade stabilization, gabion baskets, gabion mattresses, retaining walls, five storm drain systems, 2,000 LF of 12” waterline, concrete barrier, hot mix asphalt paving, continually reinforced concrete paving, pavement markings, traffic signals, signage, topsoil, and other related work.