This project includes approximately seven miles of 6”, 8”, and 12” waterline replacements throughout neighborhoods, and approximately three miles of 12”, 14”, and 24” waterline and transmission mains along four high-volume arterial streets. Scope also includes service connections, fire hydrants, other water appurtenances, sidewalks, curbs, gutters, driveways, and pavement replacement. Alternative pipe materials, such as high-density polyethylene (HDPE) were considered and evaluated during design for the new water transmission main on Warner Road and the water main on University Drive.

LocationTempe, AZOwnerCity of TempeMarketUtilitiesDelivery
Method
CMAR