This project involves the construction of 12,000 LF of four-lane interstate and bridge structures. The first phase includes the extension of the US-327 Spur – 4,000 LF of four-lane interstate and a 300-foot long, 68-foot wide pre-cast concrete girder structure with a pour-in-place concrete deck elevated above Milwaukee Avenue. The second phase includes 7,000 LF of interstate highway and frontage road with two separate bridge structures 300 feet long and 40 feet wide with a pre-cast concrete girder structure with a pour-in-place concrete deck elevated above Milwaukee Avenue. Also included are 100,600 SF MSE walls, 60,200 SY cement-treated base, 136,408 SF pour-in-place rip rap, 33,500 SY concrete paving, 217,176 CY embankment, and drainage.

LocationLubbock, TXOwnerTexas Department of Transportation (TxDOT)MarketHeavy Civil

Privacy Preference Center