FM-6 & FM-1777 Replacement of Bridges & Approaches

This project consists of the demolition and replacement of two off-system bridges in Josephine, TX. Replacement of the FM-6 bridge requires the construction of a 6,420 SY detour to reroute traffic along FM-6 prior to the demolition of the existing bridge. After demolition of the existing bridge structure, a new three-span bridge will be constructed along with approach slabs. A separate bridge structure will also be replaced by a new three-span bridge on FM-1777. The project also includes concrete structures, excavation, embankment, lime stabilization, TY-C HMAC, and delineation.